The Problem

A national multi-site client required the construction and launch of new locations across multiple states. Each site needed to be fully built out with network infrastructure, wireless systems, and workstation readiness prior to opening day.

Projects required coordination between construction teams, network providers, equipment vendors, and internal engineering teams, with no margin for delays.

  • Ground-up construction with full infrastructure requirements

  • Multiple vendors involved in each build

  • Strict timelines tied to opening dates

  • High expectations for consistency across locations


The Solution

Each new location required complete infrastructure installation and coordination from initial build through final activation readiness.

  • Installed full CAT6 structured cabling infrastructure throughout each location

  • Built out MDF/IDF network rooms including racks, ladder racking, and cable management

  • Installed cabling for wireless access points, sensors, and connected devices

  • Provided Smart Hands support for routers, switches, and network equipment

  • Coordinated with construction teams, circuit providers, and engineering teams

  • Participated in planning calls, scheduling, and status updates

All work was completed using standardized processes to ensure consistency across every location.


The Outcome

  1. All systems installed, tested, and ready for activation

  2. No delays to opening timelines

  3. Consistent infrastructure standards across all locations

  4. Seamless coordination between vendors and internal teams

National coverage, one reliable partner.

Click Here to Schedule a Free Consult.

Previous
Previous

Technology Refresh & Workstation Rollouts

Next
Next

Branch Remodels